Hammer Valley Hydro: Difference between revisions

From Stalburg Wiki
Jump to navigation Jump to search
No edit summary
mNo edit summary
 
(16 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''Hammer Valley Hydro''' is a company by [[Alex Hartman]].
{{Company_infobox
  | title = Hammer Valley Hydro
  | image = Hammer Valley Hydro Logo Color.png
  | status = Defunct <br /> ''Subsidary of'' <br /> [[Walter Corporation]]
  | industry = Hydroelectricity
  | people = [[Alex Hartman]] <br /> ''Founder''
}}


The only plant the company is known to run is the Hammer Valley Dam in [[reserve2]], which has been abandoned for an unspecified time, and then became flooded due to the fact no repairs were conducted.
'''Hammer Valley Hydro''' is a hydroelectric power company managed by [[Alex Hartman]], later acquired and subsequently bankrupted by the [[Walter Corporation]].


[[File:Floodedroom.jpeg|400px]]
==History==
Hammer Valley Hydro was a company responsible for Stalburg's clean energy production and maintenance of its hydroelectric dams; the [[reserve2|Hammer Valley Dam]] and later, the [[Two Gorges Dam]].


The company fell into severe financial issues, and Hartmann was forced to sell Hammer Valley Hydro.
Following the construction of the Two Gorges Dam however, the company started to face financial issues from the expenses posed by the new dam. Furthermore - [[Stalburg Steel]], one of Hammer Valley Hydro's major clients - went bankrupt, thus shrinking Hammer Valley Hydro's revenue stream to almost nothing. With no other option, Hartman had to sell the company. Initially, he was going to sell it to someone who could've possibly saved the company, but he backed out at the last minute for unknown reasons. Hartman was forced to sell the company to the only other buyer, the Walter Corporation.


Hartmann almost closed the deal, but the buyer backed out at the last minute for unknown reasons. Hartman's only option was to sell his company to the [[Walter Corporation]].
Hartman was hesitant to do so, aware that Jeff Walter was already infamous after bankrupting Stalburg Steel and the Bergmann Group, but did so to at least get something from the acquisition. The subsequent chain of events  led to incredibly unsafe living conditions and, supposedly, the death of Hartman's wife and child. Hartman became incredibly unstable and paranoid after this, ordering the doors to the control room of the dam to be remotely locked and ordered security at the dam to inspect people's lunchboxes. Six months after the acquisition, on June 14th, 1982, Hammer Valley Hydro filed for bankruptcy. The repercussions of this caused unemployment and caused concern among city officials over the future of Stalburg's energy production. Hartman developed a deep hatred for Jeff Walter, holding him personally responsible for Walter Co.'s actions.  


The Walter Corporation allegedly ruined the dam, and ran the company into the ground.
Unbeknownst to Hartman, Walter Co. was secretly under the management of [[S.N.W.]], who intentionally mismanaged the company and forced its bankruptcy to eliminate the company as a competitor to AtomCraft (presumably one of S.N.W.'s companies/investments), and to sever its connections to the Bergmann Group, maintaining several other powerplants in the Bergmann tunnels. S.N.W. also took advantage of the Hammer Valley Dam's grid connection as an alternate power source for the bunker while it was still in use, but soon disregarded maintenance of the Hammer Valley Dam following the bunker's closure. The dam fell into disrepair and flooded due to extensive neglect, creating a major crack on the side of the dam.  


Hammer Valley Hydro went bankrupt in [[Timeline of Events|1982]].
After bankruptcy and total abandonment, Hartman was occasionally spotted entering the dam by employees at the Hammer Valley sawmill. Hartman used the dam as a temporary base of operations to gather information against Jeff Walter, but later relocated to a small office in Stalburg's sewer system, leaving the dam completely abandoned.  


After bankrupcy, lights have been sspotted in the dam at night by some Moonshiners, but eventually, even these lights disappeared, and the dam got completely abandoned.
==INFRA==
During the events of ''INFRA'', Mark surveys the dam and partially restores power to several wings in order to progress. Mark can optionally [[Puzzle: Hammer Valley Dam|connect the dam back to grid]], doing this allows him to access the main hall in the [[bunker]] in Chapter 7.  


While traveling through the Reserve levels, the player can actually [[Puzzle: Hammer Valley Dam|FIX the Hammer Valley Dam]], which activates the power for the secret part of the [[SN|SNW Bunker]] in the [[Bunker]] level.
==Personnel==


*Alex Hartman - CEO
*Katelyn - Secretary
*Emil - Employee
*Simon - Employee


This is one of the Hammer Valley Hydro's advertisements:
==Gallery==
<gallery>
File:HammerValleyHydroPoster1.png|Aged poster advertising Hammer Valley Hydro.
File:HammerValleyHydroPoster2.png|Alternative unused variant of a poster.
File:Hammer Valley Hydro logo.png|Colorless logo.
File:Floodedroom.jpeg|Flooded generator within the dam.
</gallery>


[[File:HammerValleyHydroPoster1.png|600px]]
==Trivia==
 
*The extent of how Hammer Valley Hydro's bankruptcy led to the death of many, including Hartman's wife and child is unknown. It's possible Hartman is referring to the metro accident.

Latest revision as of 15:57, 7 June 2024

Hammer Valley Hydro
mapimage:Hammer Valley Hydro
General
Company Hammer Valley Hydro
Status Defunct
Subsidary of
Walter Corporation
Industry Hydroelectricity
Key People Alex Hartman
Founder

Hammer Valley Hydro is a hydroelectric power company managed by Alex Hartman, later acquired and subsequently bankrupted by the Walter Corporation.

History[edit | edit source]

Hammer Valley Hydro was a company responsible for Stalburg's clean energy production and maintenance of its hydroelectric dams; the Hammer Valley Dam and later, the Two Gorges Dam.

Following the construction of the Two Gorges Dam however, the company started to face financial issues from the expenses posed by the new dam. Furthermore - Stalburg Steel, one of Hammer Valley Hydro's major clients - went bankrupt, thus shrinking Hammer Valley Hydro's revenue stream to almost nothing. With no other option, Hartman had to sell the company. Initially, he was going to sell it to someone who could've possibly saved the company, but he backed out at the last minute for unknown reasons. Hartman was forced to sell the company to the only other buyer, the Walter Corporation.

Hartman was hesitant to do so, aware that Jeff Walter was already infamous after bankrupting Stalburg Steel and the Bergmann Group, but did so to at least get something from the acquisition. The subsequent chain of events led to incredibly unsafe living conditions and, supposedly, the death of Hartman's wife and child. Hartman became incredibly unstable and paranoid after this, ordering the doors to the control room of the dam to be remotely locked and ordered security at the dam to inspect people's lunchboxes. Six months after the acquisition, on June 14th, 1982, Hammer Valley Hydro filed for bankruptcy. The repercussions of this caused unemployment and caused concern among city officials over the future of Stalburg's energy production. Hartman developed a deep hatred for Jeff Walter, holding him personally responsible for Walter Co.'s actions.

Unbeknownst to Hartman, Walter Co. was secretly under the management of S.N.W., who intentionally mismanaged the company and forced its bankruptcy to eliminate the company as a competitor to AtomCraft (presumably one of S.N.W.'s companies/investments), and to sever its connections to the Bergmann Group, maintaining several other powerplants in the Bergmann tunnels. S.N.W. also took advantage of the Hammer Valley Dam's grid connection as an alternate power source for the bunker while it was still in use, but soon disregarded maintenance of the Hammer Valley Dam following the bunker's closure. The dam fell into disrepair and flooded due to extensive neglect, creating a major crack on the side of the dam.

After bankruptcy and total abandonment, Hartman was occasionally spotted entering the dam by employees at the Hammer Valley sawmill. Hartman used the dam as a temporary base of operations to gather information against Jeff Walter, but later relocated to a small office in Stalburg's sewer system, leaving the dam completely abandoned.

INFRA[edit | edit source]

During the events of INFRA, Mark surveys the dam and partially restores power to several wings in order to progress. Mark can optionally connect the dam back to grid, doing this allows him to access the main hall in the bunker in Chapter 7.

Personnel[edit | edit source]

  • Alex Hartman - CEO
  • Katelyn - Secretary
  • Emil - Employee
  • Simon - Employee

Gallery[edit | edit source]

Trivia[edit | edit source]

  • The extent of how Hammer Valley Hydro's bankruptcy led to the death of many, including Hartman's wife and child is unknown. It's possible Hartman is referring to the metro accident.