Cistern: Difference between revisions
mNo edit summary |
mNo edit summary |
||
| (2 intermediate revisions by 2 users not shown) | |||
| Line 17: | Line 17: | ||
==Story== | ==Story== | ||
===Past events=== | ===Past events=== | ||
Prior to the events of ''INFRA'', the Bergmann Group was constructing a cistern. The Stalburg Bank began to lobby against the project despite how close to it was to completion, arguing that it posed a security risk to the bank. On the verge of bankruptcy, the Bergmann Group had to abandon the project, leaving their | Prior to the events of ''INFRA'', the Bergmann Group was constructing a cistern. The Stalburg Bank began to lobby against the project despite how close to it was to completion, arguing that it posed a security risk to the bank. On the verge of bankruptcy, the Bergmann Group had to abandon the project, leaving their work lights, vehicles and other equipment behind. Following the cancellation of the project and total bankruptcy of the Bergmann group, one worker was driven to alcoholism and committed suicide in the unfinished cistern, the body is nowhere to be seen. | ||
===INFRA=== | ===INFRA=== | ||
| Line 24: | Line 24: | ||
==Locations== | ==Locations== | ||
===Cistern=== | ===Cistern=== | ||
A halted construction project by the Bergmann group. Excess water from the stormdrain would | A halted construction project by the Bergmann group. Excess water from the stormdrain would have led through outflow gates to be stored here. Most of the equipment was left behind by the workers, and the scaffolding is still up. The cistern itself showed signs of faulty construction, concrete damage being present in several places, as well as asbestos being used in the construction. | ||
=== Blocked Maintenance Tunnel === | === Blocked Maintenance Tunnel === | ||
| Line 42: | Line 42: | ||
</gallery> | </gallery> | ||
{{Modules}} | |||
{{Bot_integration}} | |||