Puzzle:Underground Water Treatment Plant: Difference between revisions

From Stalburg Wiki
Jump to navigation Jump to search
Line 1: Line 1:
== How to fix the Underground Water Treatment Plant ==
== How to fix the Underground Water Treatment Plant ==


[[File:Ach reserve.jpg|100x100px]] Fixing the plant will give you another Achievement ("Underground Water Treatment Plant")
[[File:Ach reserve.jpg|100x100px]] Fixing the plant will give you another Achievement ("Reserve : Supply the city with fresh water")





Revision as of 06:26, 7 September 2017

How to fix the Underground Water Treatment Plant

Ach reserve.jpg Fixing the plant will give you another Achievement ("Reserve : Supply the city with fresh water")


After escaping the fire, you will enter the plant and on the monitor you can see it's Initial state:

UWT.1.Initial.jpg

Turn off the 4 big flocculation pool pumps:

UWT.2.Pumps.jpg

While the alarm still sounds, open all orange card doors (one will not open):

UWT.3.Fire doors.jpg

In the locker room you will find a green access card:

UWT.4.Green card.jpg

On the first floor, in men toilet room, inside the toilet there is a yellow access card (DON'T FLUSH THE TOILET!!!):

UWT.5.Yellow card.jpg

Stop the alarm (it's is annoying :) ):

UWT.6.Fire alarm.jpg

Go to the second floor, to the control room and access it:

UWT.7.Control room.jpg

On the desk, yo will find the correct water flow and the water plant key:

UWT.8.Order key.jpg


To be continue.....