Cistern: Difference between revisions
Layout |
→Cistern Construction: Filled it out. |
||
| Line 19: | Line 19: | ||
=Locations= | =Locations= | ||
===Cistern Construction=== | ===Cistern Construction=== | ||
A halted construction project by the Bergmann group to build a cistern underground. It has several cars still inside, and the scaffolding is still up. There is Osmo Olut beer inside, placing the construction after 1983. | |||
===Runoff Discharge System=== | ===Runoff Discharge System=== | ||
{{Bot_integration}} | {{Bot_integration}} | ||