Powerstation: Difference between revisions
mNo edit summary |
mNo edit summary |
||
Line 45: | Line 45: | ||
*If Mark repaired the [[Puzzle: Hammer Valley Dam|Hammer Valley Dam]] in Act 1, a note next to the maintenance log will appear acknowledging it. | *If Mark repaired the [[Puzzle: Hammer Valley Dam|Hammer Valley Dam]] in Act 1, a note next to the maintenance log will appear acknowledging it. | ||
*An unexploded | *An unexploded incendiary bomb can be found at the back of the coal conveyor. Stepping on it will cause it to ignite but will not kill Mark. It has been theorised that the bomb is the cause of the explosion, but wheather it was intentionally placed there to sabotage the power plant is unknown. |
Revision as of 11:01, 8 November 2021
General | |
---|---|
Map Name | powerstation |
BSP Name | infra_c7_m5_powerstation |
Stalburg Map | powerstation |
Statistics | |
Photo Spots | 4 |
Corruption Spots | 1 |
Repair Spots | 1 |
Mistake Spots | 4 |
Geocaches | 0 |
Water Flow Meters | 0 |
Connected Maps | |
Previous Map | cistern |
Next Map | powerstation2 |
A coal-fired powerstation in West Stalburg. This is the final map of Act 2, and features Mark's personal introduction to Robin.
Story
Past events
Prior to the events of INFRA, Robin's most recent employment was at a local powerstation. Robin's usual incompetence and habit of breaking things led to his co-worker Ervin almost being killed. Ervin began to work less frequently at the station, to Robin's dismay.
INFRA
During the events of INFRA, Mark enters the station from its basement, and finds Ervin's radio. He speaks into it, and Robin responds, initially confusing him for Ervin, he recognizes Mark's name and tells him power cuts are happening all over the city. Robin then asks for help on doing maintenance on one of the generators.
Mark synchronizes and activates the generator. Robin contacts him again over the radio, saying he made a "tiny mistake". The generators explode, electrifying Mark, and he falls unconscious.
Locations
Coal-Fired Power Station
A local powerstation in West Stalburg. Robin and Ervin were responsible for maintenance, but Robin causes many problems, including breaking the generator hall door, and causing problems with the steam feed to the second generator. The utility frequency of the generators was 50 Hz, common for most powerplants.
Achievements
Icon | Name | Description |
---|---|---|
Working Overtime | Complete the chapter "Working Overtime". |
Gallery
Documents
Trivia
- If Mark repaired the Hammer Valley Dam in Act 1, a note next to the maintenance log will appear acknowledging it.
- An unexploded incendiary bomb can be found at the back of the coal conveyor. Stepping on it will cause it to ignite but will not kill Mark. It has been theorised that the bomb is the cause of the explosion, but wheather it was intentionally placed there to sabotage the power plant is unknown.