Main-Six: Difference between revisions
mNo edit summary |
m Minor Spelling Mistake: radiocommunicate -> radio communicate |
||
| Line 8: | Line 8: | ||
==Products== | ==Products== | ||
'''SW-WFM6-EWL-M51 Water Flow Monitors''' | '''SW-WFM6-EWL-M51 Water Flow Monitors''' radio communicate with main control board at Pitheath Water Treatment plant, providing data about the water flow in the main fresh water canals, including Fisch River, Hammer Valley River, Bergmann Tunnel No. 1 and Bergmann Tunnel No. 2. | ||
'''Switch Control''' allows the track switch to work in Auto mode, which allows it to be controlled remotely from a control center, or in Manual mode in which a physical operator can change between main and aux track from within the Switch Control panel. | '''Switch Control''' allows the track switch to work in Auto mode, which allows it to be controlled remotely from a control center, or in Manual mode in which a physical operator can change between main and aux track from within the Switch Control panel. | ||