Bergmann Water Tunnels: Difference between revisions

Nextej (talk | contribs)
Alfabe78a (talk | contribs)
m fixed spelling mistake
Line 22: Line 22:
''See also: [[Tunnel1]], [[Hallway]], [[Tunnel3]], [[Tunnel4]], [[Metroride]] and [[Waterplant]]''
''See also: [[Tunnel1]], [[Hallway]], [[Tunnel3]], [[Tunnel4]], [[Metroride]] and [[Waterplant]]''


[[File:Freshwater Tunnel 1 Start.jpg|right|400px|thumb|''The start of the tunnel no.1 in the Hammery Valley'']]
[[File:Freshwater Tunnel 1 Start.jpg|right|400px|thumb|''The start of the tunnel no.1 in Hammer Valley'']]
The first and the most important tunnel in the network, providing over 90% of the fresh water to the city, that among the citizens of Stalburg is commonly known as the "Bergmann Water Tunnel", the tunnel connects the Hammer Valley river to the [[Stalburg Central Water Plant]], moving water to the main reservoir. The tunnel hosts two major facilities lenghtwise, a [[Tunnel4|hydroelectric power plant]] built and operated in the past by [[Hammer Valley Hydro]] and a [[Tunnel2|Pine Fell Water Plant]] operated by [[Stalburg Water]], whose underground section controls the water flow rate in the tunnel, another minor water flow control facility is located between the major two. Throughout the tunnel at least 4 [[Main-Six|Water Flow Monitors]] are installed that radio communicate the state of the flow to the main control board at the [[Watertreatment|Pitheath Water Treatment Plant]] office.
The first and the most important tunnel in the network, providing over 90% of the fresh water to the city, that among the citizens of Stalburg is commonly known as the "Bergmann Water Tunnel", the tunnel connects the Hammer Valley river to the [[Stalburg Central Water Plant]], moving water to the main reservoir. The tunnel hosts two major facilities lenghtwise, a [[Tunnel4|hydroelectric power plant]] built and operated in the past by [[Hammer Valley Hydro]] and a [[Tunnel2|Pine Fell Water Plant]] operated by [[Stalburg Water]], whose underground section controls the water flow rate in the tunnel, another minor water flow control facility is located between the major two. Throughout the tunnel at least 4 [[Main-Six|Water Flow Monitors]] are installed that radio communicate the state of the flow to the main control board at the [[Watertreatment|Pitheath Water Treatment Plant]] office.