Puzzle:Underground Water Treatment Plant: Difference between revisions

No edit summary
Line 66: Line 66:
[[File:UWT.16.state3.jpg|300px|]]
[[File:UWT.16.state3.jpg|300px|]]


On the floor, where are the 4 pumps there is a grey door to raw water. Unlock it and exit through it:


To be continue.....
[[File:UWT.17.raw_water.entrance.jpg|300px|]]
 
There are two red handles, one is in the sedimentation room, the other is at the end of the tunnel. Find one of them and grab it:
 
[[File:UWT.18.handle.1.jpg|300px|]]
 
[[File:UWT.19.Handle.2.jpg|300px|]]
 
Find "sewer pipes 01 and 02" shed and enter it:
 
[[File:UWT.20.Shed.jpg|300px|]]
 
Mount the handle and open the valve:
 
[[File:UWT.21.Shed_valve.jpg|300px|]]
 
Turn around and activate the pump:
 
[[File:UWT.22.Shed_button.jpg|300px|]]
 
Find Sewer pipe 02 and open the valve:
 
[[File:UWT.23.Sewer_pipe.02.jpg|300px|]]
 
Go to the Sedimentation room and open valve 3 (all must be open):
 
[[File:UWT.24.Sedimentation_valve.jpg|300px|]]
 
Locate the hatch (near the shed entrance) and enter it:
 
[[File:UWT.25.Hatch.jpg|300px|]]
 
Inside, open the Flocculation -> Sedimentation valve:
 
[[File:UWT.26.Flocculation_sedimentation.jpg|300px|]]
 
If you done everything correct, the screen will be looking like this:
 
[[File:UWT.27.Final_state.jpg|300px|]]
 
At final, exit with the minitrain:
 
[[File:UWT.28.Exit_minitrain.jpg|300px|]]
 
Enjoy :)
137

edits