Reactor: Difference between revisions

15 bytes added ,  13 October 2018
m
No edit summary
Line 18: Line 18:
Prior to the events of INFRA, a third reactor was being constructed for the powerplant, and delayed due to problems with the supporting concrete. Woefully understaffed, the engineers in-charge of maintaining the first two reactors note that there aren't enough workers to stop an accident if something goes wrong, and that the remote controls for the control rods keep getting locked.  
Prior to the events of INFRA, a third reactor was being constructed for the powerplant, and delayed due to problems with the supporting concrete. Woefully understaffed, the engineers in-charge of maintaining the first two reactors note that there aren't enough workers to stop an accident if something goes wrong, and that the remote controls for the control rods keep getting locked.  


When Mark arrives, the powerplant is on the verge of a meltdown. He finds and activates the second set of generators, receiving managers tells him to progress further into the reactor hall and take an elevator down to the pumps. At this point, Mark will have 5 minutes to find the missing components for the pumps and activate the reactor pool emergency fill. If he fails to repair them in time, the reactor will meltdown, and Mark will have to escape to the roof before the explosion. <br>
When Mark arrives, the powerplant is on the verge of a meltdown. He finds and activates the second set of generators, then receives instructions from the manager to progress further into the reactor hall and take an elevator down to the pumps. At this point, Mark will have 5 minutes to find the missing components for the pumps and activate the reactor pool emergency fill. If he fails to repair them in time, the reactor will meltdown, and Mark will have to escape to the roof before the explosion. <br>


If Mark succeeds, the 5 minute time limit will be reset, and Mark will need to return to the elevator to proceed underneath the reactor and disengage it.   
If Mark succeeds, the 5 minute time limit will be reset, and Mark will need to return to the elevator to proceed underneath the reactor and disengage it.   
Line 30: Line 30:
The alternate way is to locate a hidden door behind some crates, if Mark collected enough corruption evidence, he'll confront the manager about hiding something and reveal what he's seen in the bunker and Jeff Walter's videotape. The manager will acknowledge Mark seems to know a lot of things, and reveals Paul has some affiliation with S.N.W too. Paul apologies about the deception and gives Mark the code. Inside, Mark will report that the floodwater has locked the remote controls through an override. Disabling the override will restore the controls, allowing the manager to operate the controls and shut down the reactor.
The alternate way is to locate a hidden door behind some crates, if Mark collected enough corruption evidence, he'll confront the manager about hiding something and reveal what he's seen in the bunker and Jeff Walter's videotape. The manager will acknowledge Mark seems to know a lot of things, and reveals Paul has some affiliation with S.N.W too. Paul apologies about the deception and gives Mark the code. Inside, Mark will report that the floodwater has locked the remote controls through an override. Disabling the override will restore the controls, allowing the manager to operate the controls and shut down the reactor.


Mark and everyone rejoice as the threat of a meltdown is over. Paul tells Mark the helicopter is waiting for him on the roof.  
Mark and everyone rejoice as the threat of a meltdown is over. Paul tells Mark the helicopter is waiting for him on the roof.
 
==Locations==
==Locations==


moderator
498

edits