Watertreatment: Difference between revisions

1 byte removed ,  26 October 2018
m
no edit summary
No edit summary
mNo edit summary
Line 14: Line 14:
   | nextmap = [[sewer]]
   | nextmap = [[sewer]]
}}
}}
This entirety of the Pitheath Water Treatment Plant, a series of several buildings responsible for treating and testing Stalburg's water for contaminants. An office building that monitors the flow of water in the dams, tunnels, and other water treatment plants in Stalburg is also on the premises. This map elaborates on several puzzles to be solved in a large area, and is the second water treatment plant Mark can choose to repair.
The entirety of the Pitheath Water Treatment Plant, a series of several buildings responsible for treating and testing Stalburg's water for contaminants. An office building that monitors the flow of water in the dams, tunnels, and other water treatment plants in Stalburg is also on the premises. This map elaborates on several puzzles to be solved in a large area, and is the second water treatment plant Mark can choose to repair.


=Story=
=Story=
moderator
498

edits