Watertreatment: Difference between revisions

20 bytes added ,  21 June 2019
m
no edit summary
m (Interwiki)
mNo edit summary
Line 1: Line 1:
{{Stub}}
{{Map_infobox
{{Map_infobox
   | image = Water_Treatment.jpg
   | image = Water_Treatment.jpg
Line 14: Line 12:
   | nextmap = [[sewer]]
   | nextmap = [[sewer]]
}}
}}
The entirety of the Pitheath Water Treatment Plant, a series of several buildings responsible for treating and testing Stalburg's water for contaminants. An office building that monitors the flow of water in the dams, tunnels, and other water treatment plants in Stalburg is also on the premises. This map elaborates on several puzzles to be solved in a large area, and is the second water treatment plant Mark can choose to repair.
The entirety of the Pitheath Water Treatment Plant, a series of several buildings responsible for treating and testing Stalburg's water for contaminants. An office building that monitors the flow of water in the dams, tunnels, and other water treatment plants in Stalburg is also on the premises. This map elaborates on several puzzles to be solved in a large area, and is the second water treatment plant Mark can choose to repair.


=Story=
=Story=
Prior to the events of INFRA, one of the water treatment plant's new grit clarifiers broke, this resulted in water contamination rising well below acceptable levels. The opening of an [[Osmo Olut]] brewery next to the treatment plant caused a number of employees to ignore their work to get drunk. The contaminated water was evidently distributed and fish began to die off in the nearby canal waters from the polluted water and a visible chemical spill.
==Past events==
Prior to the events of INFRA, one of the water treatment plant's new grit clarifiers broke, this resulted in water contamination rising well below acceptable levels.
 
The opening of an [[Osmo Olut]] brewery next to the treatment plant caused a number of employees to ignore their work to get drunk. The contaminated water was evidently distributed and fish began to die off in the nearby canal waters from the polluted water and a visible chemical spill.
 
==INFRA==
Mark enters the facility to learn of the ramifications from the Bergmann tunnel collapse, but finds his path to the office building is obstructed by keycard-locked doors and several gates. Mark once again has the choice of proceeding through the plant with minimal difficulty, or attempt to repair the plant's water purification system.  


Mark enters the facility to learn of the ramifications from the Bergmann tunnel collapse, but finds his path to the office building is obstructed by keycard-locked doors and several gates. Mark once again has the choice of proceeding through the plant with minimal difficulty, or attempt to repair the plant's water purification system. After entering the plant's office building, Mark finds the entire facility is empty, and the water flow monitor reports that the water flow has stopped in all tunnels. He calls Paul Lauwens to report the situation, and discovers that the Two Gorges Dam is also in bad shape, Paul becomes worried about the rising water pressure, he tells Mark to head back to the NCG offices to determine their next course of action, and gives him directions to a nearby metro station through an underpass. Mark exits through the back of the office to the connecting canals.  
After entering the plant's office building, Mark finds the entire facility is empty, and the water flow monitor reports that the water flow has stopped in all tunnels. He calls Paul Lauwens to report the situation, and discovers that the Two Gorges Dam is also in bad shape, Paul becomes worried about the rising water pressure, he tells Mark to head back to the NCG offices to determine their next course of action, and gives him directions to a nearby metro station through an underpass. Mark exits through the back of the office to the connecting canals.  


=Locations=
=Locations=
Anonymous user