Stalburg: Difference between revisions

152 bytes added ,  17 February 2020
m
no edit summary
mNo edit summary
mNo edit summary
Line 46: Line 46:


===Modern times (1900-)===  
===Modern times (1900-)===  
During the early 1900’s the slums surrounding Stalburg we’re removed and replaced with proper housing.
At early 1900’s to further improve the water quality (and to response the growth of the city), city contracted Bergmann to construct water tunnel from the northern lakes. During the early 1900’s the slums we’re removed and replaced with proper housing.


====World War II====
====World War II====
Anonymous user