Servicetunnel: Difference between revisions

67 bytes added ,  28 March 2022
(metadata lists one more mistake target as "transformer_FUCKUP" - investigate)
Line 40: Line 40:
===Mistake Targets===
===Mistake Targets===
*Do not leave either of the two manholes open after entering the sewer.  
*Do not leave either of the two manholes open after entering the sewer.  
*Leaving the fan off will incur a mistake penalty.  
*Switching power back to the main line after turning on the auxiliary line transformers will incur a mistake penalty.
 
==Gallery==
==Gallery==
====Documents====
====Documents====
Anonymous user