csseditors
1,817
edits
No edit summary |
mNo edit summary |
||
Line 82: | Line 82: | ||
==1950s== | ==1950s== | ||
*The earliest of the Stalburg Metro System is constructed. | |||
;Late 1950s | ;Late 1950s | ||
Line 111: | Line 112: | ||
==1970s== | ==1970s== | ||
;Between 1970s and 1980s | |||
*M3 - Ampstrand Line of Stalburg Metro System is constructed. | |||
;1973 | ;1973 | ||
Line 150: | Line 153: | ||
==1980s== | ==1980s== | ||
*Most of the present-day Stalburg Metro System is constructed. | |||
;1980 | ;1980 | ||
Line 157: | Line 161: | ||
*After working alone in the Bergmann Tunnels, Erik gets a co-worked named Robin. Erik and Robin's relationship is strained, and they spend a lot of time arguing as Robin is very careless and causes many problems to the operation of the tunnels. | *After working alone in the Bergmann Tunnels, Erik gets a co-worked named Robin. Erik and Robin's relationship is strained, and they spend a lot of time arguing as Robin is very careless and causes many problems to the operation of the tunnels. | ||
*Erik discovers green mushrooms in the Bergmann tunnels and he has fun consuming them with Robin. | *Erik discovers green mushrooms in the Bergmann tunnels and he has fun consuming them with Robin. | ||
;Before 1981 | |||
*M4 - Fish Market Line of Stalburg Metro System is extended to Obenseuer station, the metro line is renamed to Obenseuer-Fish Market Line. | |||
;1981 | ;1981 | ||
Line 203: | Line 211: | ||
*The expected completion date of the Fresh Water Tunnel in 1979. | *The expected completion date of the Fresh Water Tunnel in 1979. | ||
*January: M4 - Obenseuer-Fish Market Line of Stalburg Metro System is extended to East Port station, the metro line is renamed to East Port Line. | |||
*February 1: A yearly inspection of the Pitheath sludge canals is completed. The inspector notes problems with the sluice controls. | *February 1: A yearly inspection of the Pitheath sludge canals is completed. The inspector notes problems with the sluice controls. | ||
*March 15: Plans for the construction of a uranium mine are passed. | *March 15: Plans for the construction of a uranium mine are passed. |