Cistern: Difference between revisions

4 bytes added ,  30 October 2023
m
→‎Cistern: more fixes
mNo edit summary
m (→‎Cistern: more fixes)
Line 24: Line 24:
==Locations==
==Locations==
===Cistern===
===Cistern===
A halted construction project by the Bergmann group. Excess water from the stormdrain would of led through outflow gates be stored here. Most of the equipment was left behind by the workers, and the scaffolding is still up. The cistern itself showed signs of faulty construction, concrete damage being present in several places, as well as asbestos being used in the construction.  
A halted construction project by the Bergmann group. Excess water from the stormdrain would have led through outflow gates to be stored here. Most of the equipment was left behind by the workers, and the scaffolding is still up. The cistern itself showed signs of faulty construction, concrete damage being present in several places, as well as asbestos being used in the construction.


=== Blocked Maintenance Tunnel ===
=== Blocked Maintenance Tunnel ===