Cistern: Difference between revisions

58 bytes added ,  30 October 2023
m
→‎Cistern: more fixes
(info regarding nov 11th update)
m (→‎Cistern: more fixes)
 
(One intermediate revision by the same user not shown)
Line 24: Line 24:
==Locations==
==Locations==
===Cistern===
===Cistern===
A halted construction project by the Bergmann group. Excess water from the stormdrain would of led through outflow gates be stored here. Most of the equipment was left behind by the workers, and the scaffolding is still up. The cistern itself showed signs of faulty construction, concrete damage being present in several places, as well as asbestos being used in the construction.  
A halted construction project by the Bergmann group. Excess water from the stormdrain would have led through outflow gates to be stored here. Most of the equipment was left behind by the workers, and the scaffolding is still up. The cistern itself showed signs of faulty construction, concrete damage being present in several places, as well as asbestos being used in the construction.


=== Blocked Maintenance Tunnel ===
=== Blocked Maintenance Tunnel ===
Line 37: Line 37:
====Locations====
====Locations====
<gallery>
<gallery>
File:PreCisternHall.jpg|The tunnel before the update.
File:CisternHall.jpg|The changed tunnel after the November 11th update.  
File:CisternHall.jpg|The changed tunnel after the November 11th update.  
File:CisternMorkoMask.jpg| Unique mask model behind the crack in the barricade.  
File:CisternMorkoMask.jpg| Unique mask model behind the crack in the barricade.