Timeline of Events: Difference between revisions

m
no edit summary
(Added some more information as well as the newspaper in the epilogue. Page is a little less symmetrical now which is a shame.)
mNo edit summary
Line 94: Line 94:
;1959
;1959


*The construction of Hammer Valley Dam had started.
*The Hammer Valley Sawmill is burnt down.
*The Hammer Valley Sawmill is burnt down.
*The Fresh Water Act of 1959 is put into effect, allowing Stalburg Water to veto decisions regarding projects endangering water supplies.
*The Fresh Water Act of 1959 is put into effect, allowing Stalburg Water to veto decisions regarding projects endangering water supplies.
Line 101: Line 102:
*The vonvrete tenement is built by Walter Group.
*The vonvrete tenement is built by Walter Group.
*Stalburg experiences its peak industrialisation due to steel manufacturer, Stalburg Steel.
*Stalburg experiences its peak industrialisation due to steel manufacturer, Stalburg Steel.
;1961
*The Hammer Valley Sawmill had been rebuilt.


;1962
;1962


*The Hammer Valley Dam starts operation. A log chute is built for logs to get past the dam and too the sawmill.
*The construction of Hammer Valley Dam was completed and the dam started operation. A log chute is built for logs to get past the dam and too the sawmill.
*Operation restarts at the Hammer Valley Sawmill.
*Operation restarts at the Hammer Valley Sawmill for the first time since its rebuild.


;Between 1964 and 1965
;Between 1964 and 1965
csseditors
1,254

edits