Watertreatment: Difference between revisions

626 bytes added ,  20 November 2023
m
→‎INFRA: just added a minor detail
No edit summary
m (→‎INFRA: just added a minor detail)
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Stub}}
{{Map_infobox
{{Map_infobox
   | image = Water_Treatment.jpg
   | image = Water_Treatment.jpg
Line 14: Line 12:
   | nextmap = [[sewer]]
   | nextmap = [[sewer]]
}}
}}
This entirety of the Pitheath Water Treatment Plant, a series of several buildings responsible for treating and testing Stalburg's water for contaminants. An office building that monitors the flow of water in the dams, tunnels, and other water treatment plants in Stalburg is also on the premises. This map elaborates on several puzzles to be solved in a large area, and is the second water treatment plant Mark can choose to repair.


=Story=
The entirety of the Pitheath Water Treatment Plant, a series of several buildings responsible for treating and testing Stalburg's water for contaminants. An office building that monitors the flow of water in the dams, tunnels, and other water treatment plants in Stalburg is also on the premises. This map elaborates on several puzzles to be solved in a large area, and is the second water treatment plant Mark can choose to repair.
Prior to the events of INFRA, one of the water treatment plant's new grit clarifiers broke, this resulted in water contamination rising well below acceptable levels. The opening of an Osmo Olut brewery next to the treatment plant caused a number employees to ignore their work to get drunk. The contaminated water was evidently distributed and fish began to die off in the nearby canal waters from the polluted water and a visible chemical spill.


Mark enters the facility to learn of the ramifications from the Bergmann tunnel collapse, but finds his path to the office building is obstructed by keycard-locked doors and several gates. Mark once again has the choice of proceeding through the plant with minimal difficulty, or attempt to repair the plant's water purification system. After entering the plant's office building, Mark finds the entire facility is empty, and the water flow monitor reports that the water flow has stopped in all tunnels. He calls Paul Lauwens to report the situation, and discovers that the Two Gorges Dam is also in bad shape, Paul becomes worried about the rising water pressure, he tells Mark to head back to the NCG offices to determine their next course of action, and gives him directions to a nearby metro station through an underpass.  
==Story==
===Past events===
Prior to the events of INFRA, one of the water treatment plant's new grit clarifiers broke, this resulted in water contamination rising well below acceptable levels.


=Locations=
The opening of an [[Osmo Olut]] brewery next to the treatment plant caused a number of employees to ignore their work to get drunk. The contaminated water was evidently distributed and fish began to die off in the nearby canal waters from the polluted water and a visible chemical spill.
 
===INFRA===
Mark enters the facility to learn of the ramifications from the Bergmann tunnel collapse, but finds his path to the office building is obstructed by keycard-locked doors and several gates. Mark once again has the choice of proceeding through the plant with minimal difficulty, or attempt to repair the plant's water purification system.
 
After entering the plant's office building, Mark finds the entire facility is empty, and if the player has activated all of the water flow meaters, then the water flow monitor reports that the water flow has stopped in all tunnels. He calls Paul Lauwens to report the situation, and discovers that the Two Gorges Dam is also in bad shape, Paul becomes worried about the rising water pressure, he tells Mark to head back to the NCG offices to determine their next course of action, and gives him directions to a nearby metro station through an underpass. Mark exits through the back of the office to the connecting canals.
 
==Locations==
===Pitheath Water Treatment Plant===
===Pitheath Water Treatment Plant===
The Pitheath Water Treatment Plant is part of [[Stalburg Water]], and responsible for purifying the water pumped out of the tunnels into clean water. It has been relatively well maintained, but has developed severe problems over years from neglect of its machinery and buildings. For example, one of the plant's secondary clarifiers hasn't been maintained in ages, the chlorine building has sprung a deadly leak, and the software running the grit classifiers is corrupted. Furthermore, one of the buildings has several concrete faults and clearly hasn't seen use in years judging from the Employee of the Year award which has not been updated for three decades, and a newspaper from when the [[furnace|Stalburg Steel Factory]] shut down on a desk.  
The Pitheath Water Treatment Plant is part of [[Stalburg Water]], and responsible for purifying the water pumped out of the tunnels into clean water. It has been relatively well maintained, but has developed severe problems over years from neglect of its machinery and buildings. For example, one of the plant's secondary clarifiers hasn't been maintained in ages, the chlorine building has sprung a deadly leak, and the software running the grit classifiers is corrupted. Furthermore, one of the buildings has several concrete faults and clearly hasn't seen use in years judging from the Employee of the Year award which has not been updated for three decades, and a newspaper from when the [[furnace|Stalburg Steel Factory]] shut down on a desk.  
Line 29: Line 34:
=Achievements=
=Achievements=
{| class="wikitable sortable" style="width: 70%;"
{| class="wikitable sortable" style="width: 70%;"
!style="width: 5%"| Icon !!style ="width: 20%""| Name !!style="width: 75%" | Description
! style="width: 5%" |Icon!! style="width: 20%" " |Name!! style="width: 75%" |Description
|-
|-
|[[File:Ach notsofreshwater.jpg]]||Not so Fresh Water||Analyze a water sample at the Pitheath Water Treatment Plant and document the result.
|[[File:Ach notsofreshwater.jpg]]||Not so Fresh Water||Analyze a water sample at the Pitheath Water Treatment Plant and document the result.
Line 38: Line 43:
===Hidden Achievements===
===Hidden Achievements===
{| class="wikitable sortable mw-collapsible mw-collapsed" style="width: 70%;"
{| class="wikitable sortable mw-collapsible mw-collapsed" style="width: 70%;"
!style="width: 5%"| Icon !!style ="width: 20%""| Name !!style="width: 75%" | Description
! style="width: 5%" |Icon!! style="width: 20%" " |Name!! style="width: 75%" |Description
|-
|-
|[[File:Ach_removekebab.jpg]]||Remove Kebab||Eat the kebab roll at the Pitheath Water Treatment Plant.
|[[File:Ach_removekebab.jpg]]||Remove Kebab||Eat the kebab roll at the Pitheath Water Treatment Plant.
Line 44: Line 49:
|[[File:Anarchist.jpg]]||Anarchist||Disregard the office rules at the Pitheath Water Treatment Plant.
|[[File:Anarchist.jpg]]||Anarchist||Disregard the office rules at the Pitheath Water Treatment Plant.
|}
|}
{{Bot_integration}}


=Trivia=
===Mistake Targets===
*Attempting to enter the building by breaking through the glass window will incur a mistake penalty and set off the building's alarm.
 
==Gallery==
====Documents====
<gallery>
File:Newspaper 001 skin7.png|Stalburg Times newspaper dated December 17th, 1981.
File:Binder 002 skin4.png|Maintenance log for the grit classifiers.
File:Tablet screen skin5.png|Chat log discussing the quality of water in the Bergmann tunnels. 
</gallery>
 
==Trivia==
 
*If Mark fixed all the problems in the [[tunnel2|Pine Fell Water Plant]], an email in the Stalburg Water office building from Roman Banis will change to acknowledge the repairs.
*If Mark fixed all the problems in the [[tunnel2|Pine Fell Water Plant]], an email in the Stalburg Water office building from Roman Banis will change to acknowledge the repairs.
*A sign of "SUMMER CAR CENTER" can be seen in the background, which is a reference to the old Loiste Interactive office that was located in the same office space as the former [https://en.wikipedia.org/wiki/Sunny_Car_Center Sunny car center]. The sign is also a tribute to another Finnish game, [https://en.wikipedia.org/wiki/My_Summer_Car My Summer Car.]
*A "SUMMER CAR CENTER" sign can be seen in the background, which is a reference to the old [[Loiste Interactive]] office that was located in the same office space as the former [https://en.wikipedia.org/wiki/Sunny_Car_Center Sunny Car Center]. The sign is also a tribute to another Finnish game, [https://en.wikipedia.org/wiki/My_Summer_Car My Summer Car.]
 
{{Bot_integration}}
5

edits