Watertreatment: Difference between revisions
Jump to navigation
Jump to search
no edit summary
No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
The entirety of the Pitheath Water Treatment Plant, a series of several buildings responsible for treating and testing Stalburg's water for contaminants. An office building that monitors the flow of water in the dams, tunnels, and other water treatment plants in Stalburg is also on the premises. This map elaborates on several puzzles to be solved in a large area, and is the second water treatment plant Mark can choose to repair. | The entirety of the Pitheath Water Treatment Plant, a series of several buildings responsible for treating and testing Stalburg's water for contaminants. An office building that monitors the flow of water in the dams, tunnels, and other water treatment plants in Stalburg is also on the premises. This map elaborates on several puzzles to be solved in a large area, and is the second water treatment plant Mark can choose to repair. | ||
=Story= | ==Story== | ||
==Past events== | ===Past events=== | ||
Prior to the events of INFRA, one of the water treatment plant's new grit clarifiers broke, this resulted in water contamination rising well below acceptable levels. | Prior to the events of INFRA, one of the water treatment plant's new grit clarifiers broke, this resulted in water contamination rising well below acceptable levels. | ||
The opening of an [[Osmo Olut]] brewery next to the treatment plant caused a number of employees to ignore their work to get drunk. The contaminated water was evidently distributed and fish began to die off in the nearby canal waters from the polluted water and a visible chemical spill. | The opening of an [[Osmo Olut]] brewery next to the treatment plant caused a number of employees to ignore their work to get drunk. The contaminated water was evidently distributed and fish began to die off in the nearby canal waters from the polluted water and a visible chemical spill. | ||
==INFRA== | ===INFRA=== | ||
Mark enters the facility to learn of the ramifications from the Bergmann tunnel collapse, but finds his path to the office building is obstructed by keycard-locked doors and several gates. Mark once again has the choice of proceeding through the plant with minimal difficulty, or attempt to repair the plant's water purification system. | Mark enters the facility to learn of the ramifications from the Bergmann tunnel collapse, but finds his path to the office building is obstructed by keycard-locked doors and several gates. Mark once again has the choice of proceeding through the plant with minimal difficulty, or attempt to repair the plant's water purification system. | ||
After entering the plant's office building, Mark finds the entire facility is empty, and the water flow monitor reports that the water flow has stopped in all tunnels. He calls Paul Lauwens to report the situation, and discovers that the Two Gorges Dam is also in bad shape, Paul becomes worried about the rising water pressure, he tells Mark to head back to the NCG offices to determine their next course of action, and gives him directions to a nearby metro station through an underpass. Mark exits through the back of the office to the connecting canals. | After entering the plant's office building, Mark finds the entire facility is empty, and the water flow monitor reports that the water flow has stopped in all tunnels. He calls Paul Lauwens to report the situation, and discovers that the Two Gorges Dam is also in bad shape, Paul becomes worried about the rising water pressure, he tells Mark to head back to the NCG offices to determine their next course of action, and gives him directions to a nearby metro station through an underpass. Mark exits through the back of the office to the connecting canals. | ||
=Locations= | ==Locations== | ||
===Pitheath Water Treatment Plant=== | ===Pitheath Water Treatment Plant=== | ||
The Pitheath Water Treatment Plant is part of [[Stalburg Water]], and responsible for purifying the water pumped out of the tunnels into clean water. It has been relatively well maintained, but has developed severe problems over years from neglect of its machinery and buildings. For example, one of the plant's secondary clarifiers hasn't been maintained in ages, the chlorine building has sprung a deadly leak, and the software running the grit classifiers is corrupted. Furthermore, one of the buildings has several concrete faults and clearly hasn't seen use in years judging from the Employee of the Year award which has not been updated for three decades, and a newspaper from when the [[furnace|Stalburg Steel Factory]] shut down on a desk. | The Pitheath Water Treatment Plant is part of [[Stalburg Water]], and responsible for purifying the water pumped out of the tunnels into clean water. It has been relatively well maintained, but has developed severe problems over years from neglect of its machinery and buildings. For example, one of the plant's secondary clarifiers hasn't been maintained in ages, the chlorine building has sprung a deadly leak, and the software running the grit classifiers is corrupted. Furthermore, one of the buildings has several concrete faults and clearly hasn't seen use in years judging from the Employee of the Year award which has not been updated for three decades, and a newspaper from when the [[furnace|Stalburg Steel Factory]] shut down on a desk. | ||
Line 49: | Line 49: | ||
|[[File:Anarchist.jpg]]||Anarchist||Disregard the office rules at the Pitheath Water Treatment Plant. | |[[File:Anarchist.jpg]]||Anarchist||Disregard the office rules at the Pitheath Water Treatment Plant. | ||
|} | |} | ||
=Gallery= | ===Mistake Targets=== | ||
*Attempting to enter the building by breaking through the glass window will incur a mistake penalty and set off the building's alarm. | |||
==Gallery== | |||
====Documents==== | ====Documents==== | ||
<gallery> | <gallery> | ||
Line 59: | Line 61: | ||
</gallery> | </gallery> | ||
=Trivia= | ==Trivia== | ||
*If Mark fixed all the problems in the [[tunnel2|Pine Fell Water Plant]], an email in the Stalburg Water office building from Roman Banis will change to acknowledge the repairs. | *If Mark fixed all the problems in the [[tunnel2|Pine Fell Water Plant]], an email in the Stalburg Water office building from Roman Banis will change to acknowledge the repairs. | ||
*A "SUMMER CAR CENTER" sign can be seen in the background, which is a reference to the old [[Loiste Interactive]] office that was located in the same office space as the former [https://en.wikipedia.org/wiki/Sunny_Car_Center Sunny Car Center]. The sign is also a tribute to another Finnish game, [https://en.wikipedia.org/wiki/My_Summer_Car My Summer Car.] | *A "SUMMER CAR CENTER" sign can be seen in the background, which is a reference to the old [[Loiste Interactive]] office that was located in the same office space as the former [https://en.wikipedia.org/wiki/Sunny_Car_Center Sunny Car Center]. The sign is also a tribute to another Finnish game, [https://en.wikipedia.org/wiki/My_Summer_Car My Summer Car.] | ||
{{Bot_integration}} |