Cistern: Difference between revisions

220 bytes added ,  15 September 2018
(Layout)
(→‎Cistern Construction: Filled it out.)
Line 19: Line 19:
=Locations=
=Locations=
===Cistern Construction===
===Cistern Construction===
A halted construction project by the Bergmann group to build a cistern underground. It has several cars still inside, and the scaffolding is still up. There is Osmo Olut beer inside, placing the construction after 1983.


===Runoff Discharge System===
===Runoff Discharge System===


{{Bot_integration}}
{{Bot_integration}}
80

edits