Cistern: Difference between revisions

Jump to navigation Jump to search
721 bytes added ,  11 October 2018
no edit summary
(→‎Cistern Construction: Filled it out.)
No edit summary
Line 16: Line 16:


=Story=
=Story=
 
Before the events of INFRA, the Bergmann Group was constructing a cistern. The Stalburg Bank began to lobby against the project despite how close to it was to completion, arguing that it posed a security risk to the bank. On the verge of bankruptcy, the Bergmann Group had to abandon the project, leaving several worklights, vehicles and equipment to collect dust. Following the cancellation of the project and total bankruptcy of the Bergmann group, one worker was driven to alcoholism and committed suicide in the unfinished cistern, the body is nowhere to be seen. Mark passes through here in his attempt to reach the surface. Descending and ascending from the many platforms, he makes his way to basement of a nearby powerstation.
=Locations=
=Locations=
===Cistern Construction===
===Cistern===
A halted construction project by the Bergmann group to build a cistern underground. It has several cars still inside, and the scaffolding is still up. There is Osmo Olut beer inside, placing the construction after 1983.
A halted construction project by the Bergmann group to build a cistern underground. It has several cars still inside, and the scaffolding is still up. There is Osmo Olut beer inside, placing the construction after 1983.


moderator
498

edits

Navigation menu