Tunnel4: Difference between revisions

10 bytes removed ,  13 July 2023
m
2/2 minor corrections
No edit summary
m (2/2 minor corrections)
 
Line 13: Line 13:
}}
}}


The final section of the Bergmann tunnels surveyed by Mark. It visits a power plants containing several hydroelectric generators, and the construction site of an abandoned section of tunnels. This map continues the action sequence from the previous map, and features the first unmissable sightings of [[SMV#Mushroom_Types|green mushrooms]]. There are multiple paths and several optional rooms to explore through the use of fuses.  
The final section of the Bergmann tunnels surveyed by Mark. It visits a power plant containing several hydroelectric generators, and the construction site of an abandoned section of tunnels. This map continues the action sequence from the previous map, and features the first unmissable sightings of [[SMV#Mushroom_Types|green mushrooms]]. There are multiple paths and several optional rooms to explore through the use of fuses.  


==Story==
==Story==
Line 28: Line 28:
==Locations==
==Locations==
===Bergmann Power Plant===
===Bergmann Power Plant===
The Bergmann power plant contains a set set of hydroelectric generators that control and use the flow of water through the tunnels to generate electricity for the city, namely the steel mill and other minor industrial sectors. The company came into financial trouble when Stalburg Steel closed down, no longer having a major client to sell their electricity to.
The Bergmann power plant contains a set of hydroelectric generators that control and use the flow of water through the tunnels to generate electricity for the city, namely the steel mill and other minor industrial sectors. The company came into financial trouble when Stalburg Steel closed down, no longer having a major client to sell their electricity to.


===Unfinished Bergmann Tunnel===
===Unfinished Bergmann Tunnel===
The new Bergmann Tunnel was an ambitious construction project aiming to rejuvenate the failing structure of the tunnel, add new advanced control rooms, and increase tunnel flow. The construction was going well until the company ran into financial issues with their major client going under, and their new management at Walter Co. mismanaging and halting construction completely. The use of dynamite in the excavation of the new tunnels also lead to severe disturbance of the older tunnels, leading to the collapse. As the company went went bankrupt, the tunnels and construction were abandoned.
The new Bergmann Tunnel was an ambitious construction project aiming to rejuvenate the failing structure of the tunnel, add new advanced control rooms, and increase tunnel flow. The construction was going well until the company ran into financial issues with their major client going under, and their new management at Walter Co. mismanaging and halting construction completely. The use of dynamite in the excavation of the new tunnels also lead to severe disturbance of the older tunnels, leading to the collapse. As the company went bankrupt, the tunnels and construction were abandoned.


==Achievements==
==Achievements==