Npp: Difference between revisions
No edit summary |
No edit summary |
||
Line 16: | Line 16: | ||
The Black Rock Nuclear Powerplant, built by [[Stalburg Industry Power]], is the source of Stalburg's nuclear energy production and the final location visited during the events of ''INFRA''. | The Black Rock Nuclear Powerplant, built by [[Stalburg Industry Power]], is the source of Stalburg's nuclear energy production and the final location visited during the events of ''INFRA''. | ||
=History= | |||
A third "ERP-type" reactor had been in construction for the powerplant since 2008, and was going to double Stalburg's energy production compared to the older boiling water reactors. The construction was estimated to finish by 2012, but was delayed multiple times (likely due to the political corruption and embezzlement of maintenance funds). | A third "ERP-type" reactor had been in construction for the powerplant since 2008, and was going to double Stalburg's energy production compared to the older boiling water reactors. The construction was estimated to finish by 2012, but was delayed multiple times (likely due to the political corruption and embezzlement of maintenance funds). | ||
=Story= | |||
Entering the powerplant, Mark is contacted over the radio again by Paul, who explains the situation is worst than they thought, floodwater has already gotten inside the containment building, everything is running on emergency power, and everyone appears to have just left. To make matters worse, Carla and Amit have gone missing. Paul manages to find the manager of the powerplant, who initially says there's nothing that can be done, but remarks that if they're willing to risk their lives, they can try to stop the reactor from a meltdown. The manager instructs Mark to locate and activate the auxiliary generators. Mark can find the keycard to get Carla and Amit out of the office they stuck in, and crosses over the flooded turbine hall. | Entering the powerplant, Mark is contacted over the radio again by Paul, who explains the situation is worst than they thought, floodwater has already gotten inside the containment building, everything is running on emergency power, and everyone appears to have just left. To make matters worse, Carla and Amit have gone missing. Paul manages to find the manager of the powerplant, who initially says there's nothing that can be done, but remarks that if they're willing to risk their lives, they can try to stop the reactor from a meltdown. The manager instructs Mark to locate and activate the auxiliary generators. Mark can find the keycard to get Carla and Amit out of the office they stuck in, and crosses over the flooded turbine hall. | ||
The auxiliary generators are malfunctioning, and the manager asks Mark to investigate a second set of generators deeper inside the powerplant. | The auxiliary generators are malfunctioning, and the manager asks Mark to investigate a second set of generators deeper inside the powerplant. | ||
=Achievements= | |||
{| class="wikitable sortable" style="width: 70%;" | |||
!style="width: 5%"| Icon !!style ="width: 20%""| Name !!style="width: 75%" | Description | |||
|- | |||
|[[File:Ach locksmith.jpg]]||Locksmith||Help Carla and Amit. | |||
|} | |||
=Gallery= | =Gallery= |
Revision as of 02:10, 8 November 2018
This article is a stub. You can help the wiki by expanding it. |
General | |
---|---|
Map Name | npp |
BSP Name | infra_c10_m1_npp |
Stalburg Map | npp |
Statistics | |
Photo Spots | 12 |
Corruption Spots | 1 |
Repair Spots | 0 |
Mistake Spots | 0 |
Geocaches | 0 |
Water Flow Meters | 0 |
Connected Maps | |
Previous Map | field |
Next Map | reactor |
The Black Rock Nuclear Powerplant, built by Stalburg Industry Power, is the source of Stalburg's nuclear energy production and the final location visited during the events of INFRA.
History
A third "ERP-type" reactor had been in construction for the powerplant since 2008, and was going to double Stalburg's energy production compared to the older boiling water reactors. The construction was estimated to finish by 2012, but was delayed multiple times (likely due to the political corruption and embezzlement of maintenance funds).
Story
Entering the powerplant, Mark is contacted over the radio again by Paul, who explains the situation is worst than they thought, floodwater has already gotten inside the containment building, everything is running on emergency power, and everyone appears to have just left. To make matters worse, Carla and Amit have gone missing. Paul manages to find the manager of the powerplant, who initially says there's nothing that can be done, but remarks that if they're willing to risk their lives, they can try to stop the reactor from a meltdown. The manager instructs Mark to locate and activate the auxiliary generators. Mark can find the keycard to get Carla and Amit out of the office they stuck in, and crosses over the flooded turbine hall.
The auxiliary generators are malfunctioning, and the manager asks Mark to investigate a second set of generators deeper inside the powerplant.
Achievements
Icon | Name | Description |
---|---|---|
Locksmith | Help Carla and Amit. |
Gallery
Documents
Trivia
- Black Rock NPP is based off of Olkiluoto-3, one of Finland's two nuclear power plants. Olkiluoto-3 is particularly infamous for having numerous delays in construction of its reactors.