Puzzle:Underground Water Treatment Plant: Difference between revisions
mNo edit summary |
m (CitadelCore moved page Puzzle: Underground Water Treatment Plant to PZ: Underground Water Treatment Plant without leaving a redirect) |
(No difference)
|
Revision as of 10:43, 21 June 2019
Fixing the plant will give you another achievement ("Reserve: Supply the city with fresh water").
After escaping the fire, you will enter the plant and on the monitor you can see its initial state:
Turn off the 4 big flocculation pool pumps:
While the alarm still sounds, open all orange card doors (one will not open):
In the locker room you will find a green access card:
On the first floor, in the men's toilet, is a yellow access card. Do not flush the toilet, or you'll have to restart the map:
Stop the alarm.
Go to the second floor, to the control room and access it:
On the desk, yo will find the correct water flow and the water plant key:
Find this place and go to the hidden valve room using this path:
Open the valve of SEWER PIPE 03:
Find and unlock the raw water pool door:
And open RAW WATER to COAGULATION valve:
So far the screen must look like this:
Find the Flocculation start button and push it to start:
And the screen must look like this now:
On the floor, where are the 4 pumps there is a grey door to raw water. Unlock it and exit through it:
There are two red handles, one is in the sedimentation room, the other is at the end of the tunnel. Find one of them and grab it:
Find "sewer pipes 01 and 02" shed and enter it:
Mount the handle and open the valve:
Turn around and activate the pump:
Find Sewer pipe 02 and open the valve:
Go to the Sedimentation room and open valve 3 (all must be open):
Locate the hatch (near the shed entrance) and enter it:
Inside, open the Flocculation -> Sedimentation valve:
If you done everything correct, the screen will look like this:
Finally, exit with the minitrain:
Enjoy :)