Watertreatment

Revision as of 19:02, 6 September 2018 by Willisika (talk | contribs) (Added trivia section.)

watertreatment
mapimage:watertreatment
General
Map Name watertreatment
BSP Name infra_c5_m1_watertreatment
Stalburg Map watertreatment
Statistics
Photo Spots 17
Corruption Spots 4
Repair Spots 2
Mistake Spots 1
Geocaches 2
Water Flow Meters 0
Connected Maps
Previous Map tower
Next Map sewer


This map contains the entirety of the Pitheath Water Treatment Plant. The player must advance through the treatment facility to get to the water flow control center, and report their findings to the boss. The facility elaborates on the keycard puzzle system, and is only recently abandoned.

Story

At some point before the events of Infra, a green mushroom infestation occurred in the back room of the laboratory at the Pitheath Water Treatment Plant. Workers took advantage of this infestation, and harvested it for their own recreational use. The water began to show signs of pollution immediately before the events of Infra, results that can be recreated by Mark using a water sample at the laboratory. The pollution only got worse, and during the events of Infra, fish began to die off in the canal waters. Shortly before Mark arrives at the treatment plant, water flow monitors began to show that water flow through key tunnels had stopped. Mark arrives at the facility after-hours, repairs the secondary clarifiers to pass through to the monitoring facility, and reports his findings at the water flow monitoring room. He escapes the locked building, and continues on to get back to the office.

Locations

Pitheath Water Treatment Plant

The Pitheath Water Treatment Plant is part of Stalburg Water, responsible for converting the water pumped out of the tunnels into clean water for use by the citizens. It has been relatively well maintained, but recently showed signs of failure in its machinery and buildings. For example, the security system often triggers itself without any intrusion, the chlorine building has sprung a deadly leak, and the software running the grit classifiers is corrupted. Unusually, the security building's employee of the year sign had not been updated for three decades, and there is a newspaper from when the Stalburg Steel Factory shut down on a desk.

Development

Achievements

Icon Name Description
  Not so Fresh Water Analyze a water sample at the Pitheath Water Treatment Plant and document the result.
  Purification Fix all the problems at the Pitheath Water Treatment Plant.

Hidden Achievements

Icon Name Description
  Remove Kebab Eat the kebab roll at the Pitheath Water Treatment Plant.
  Anarchist Disregard the office rules at the Pitheath Water Treatment Plant.

Trivia

  • A sign of "SUMMER CAR CENTER" can be seen in the background, which is a reference to the old Loiste Interactive office that was located in the same office space as the former Sunny car center.