Powerstation: Difference between revisions

Jump to navigation Jump to search
264 bytes added ,  8 November 2018
no edit summary
No edit summary
No edit summary
Line 15: Line 15:
}}
}}


A coal-fired powerstation in West Stalburg. This is the final map of Act 2, and features the Mark's introduction to Robin.  
A coal-fired powerstation in West Stalburg. This is the final map of Act 2, and features the Mark's personal introduction to Robin.  


=Story=
=Story=
Line 25: Line 25:
===Coal-Fired Power Station===
===Coal-Fired Power Station===
A local powerstation in West Stalburg. Robin and Ervin were responsible for maintenance, but Robin causes many problems, including breaking the generator hall door, and causing problems with the steam feed to the second generator. The utility frequency of the generators was 50 Hz, common for most powerplants.   
A local powerstation in West Stalburg. Robin and Ervin were responsible for maintenance, but Robin causes many problems, including breaking the generator hall door, and causing problems with the steam feed to the second generator. The utility frequency of the generators was 50 Hz, common for most powerplants.   
=Achievements=
{| class="wikitable sortable" style="width: 70%;"
!style="width: 5%"| Icon !!style ="width: 20%""| Name !!style="width: 75%" | Description
|-
|[[File:Ach workingovertime.jpg]]||Working Overtime||Complete the chapter "Working Overtime".
|}


=Gallery=
=Gallery=
moderator
498

edits

Navigation menu