INFRA plot: Difference between revisions

Jump to navigation Jump to search
543 bytes added ,  31 October 2023
(wrote up chapter 5 summary w/o story paragraph)
Line 36: Line 36:


===Chapter 6: Public Transport===
===Chapter 6: Public Transport===
Waking up from the destroyed sewer, Mark finds his way into the Pitheath Metro Station, which is closed due to the ongoing protests. A maintenance tram is later left near the train tracks, which Mark rides through more sections of the metro line, before the floor gives way, and the train crashes into another part of the Bergmann tunnels, which lead him to the Stalburg Central Water Plant. After going through that, Mark rides through a bunch of minitrain tunnels
and makes his way over to the Central Railway Station, which is also closed.


===Chapter 7: Working Overtime===
===Chapter 7: Working Overtime===

Navigation menu