Arívá Construction: Difference between revisions

Jump to navigation Jump to search
m
Minor Spelling Mistake: occured -> occurred
mNo edit summary
m (Minor Spelling Mistake: occured -> occurred)
Line 9: Line 9:


==Construction history==
==Construction history==
In 2008, [[Stalburg Industry Power]] began an expansion of the [[Npp|nuclear power plant]] to the Black Rock 3 with EPR-type reactor that the Arivá Construction is seen building. The construction was scheduled to be completed in 2012, however several major setbacks occured since, in the 2016, a new expected date of completion was announced to spring of 2018.
In 2008, [[Stalburg Industry Power]] began an expansion of the [[Npp|nuclear power plant]] to the Black Rock 3 with EPR-type reactor that the Arivá Construction is seen building. The construction was scheduled to be completed in 2012, however several major setbacks occurred since, in the 2016, a new expected date of completion was announced to spring of 2018.


In January 2017, the [[Stalburg City Council]] had approved plan for construction of Stalburg Skytree project, a mixed-use 50-story skyscraper with three smaller buildings that the Arivá Construction is set to built. The construction is located on a former industrial plot in Business district, north of the railway station and is scheduled to begin in February of the same year.
In January 2017, the [[Stalburg City Council]] had approved plan for construction of Stalburg Skytree project, a mixed-use 50-story skyscraper with three smaller buildings that the Arivá Construction is set to built. The construction is located on a former industrial plot in Business district, north of the railway station and is scheduled to begin in February of the same year.
90

edits

Navigation menu