Obenseuer/Notes/Bergmann Tunnels Condition: Difference between revisions

ABC-DEFG (talk | contribs)
mNo edit summary
ABC-DEFG (talk | contribs)
mNo edit summary
 
(2 intermediate revisions by the same user not shown)
Line 6: Line 6:
Anyway, I still have a lot of things to get fixed here, because that previous Bergmann tunnel worker Robin broke everything! Like that flood door at the bottom! You have to close floodgates that leads to that tunnel and open main 02 to get that flood door open.
Anyway, I still have a lot of things to get fixed here, because that previous Bergmann tunnel worker Robin broke everything! Like that flood door at the bottom! You have to close floodgates that leads to that tunnel and open main 02 to get that flood door open.


-Mike}}
-Mike
}}