Puzzles Portal: Difference between revisions

R0CK3R (talk | contribs)
added link to hammer valley dam
R0CK3R (talk | contribs)
No edit summary
Line 11: Line 11:
|[https://stalburg.arctar.us/Reserve2 Hammer Vally Dam]
|[https://stalburg.arctar.us/Reserve2 Hammer Vally Dam]
|2 - Just another Day at Work
|2 - Just another Day at Work
|[https://stalburg.arctar.us/Puzzle:_Hammer_Valley_Dam You need to Activate, Synchronise, and then Connect the Dam to the Power Grid.]
|[https://stalburg.arctar.us/Puzzle:_Hammer_Valley_Dam Activate, Synchronise, and then Connect the Dam to the Power Grid.]