Servicetunnel: Difference between revisions
metadata lists one more mistake target as "transformer_FUCKUP" - investigate |
|||
| Line 40: | Line 40: | ||
===Mistake Targets=== | ===Mistake Targets=== | ||
*Do not leave either of the two manholes open after entering the sewer. | *Do not leave either of the two manholes open after entering the sewer. | ||
* | *Switching power back to the main line after turning on the auxiliary line transformers will incur a mistake penalty. | ||
==Gallery== | ==Gallery== | ||
====Documents==== | ====Documents==== | ||