Npp: Difference between revisions

Lapo7 (talk | contribs)
m Changed typo from ERP-type reactor to EPR-type
Line 17: Line 17:
==Story==
==Story==
===Past events===
===Past events===
A third "ERP-type" reactor had been in construction for the powerplant since 2008, and was going to double Stalburg's energy production compared to the older boiling water reactors. The construction was estimated to finish by 2012, but was delayed multiple times (likely due to the political corruption and embezzlement of maintenance funds).
A third "EPR-type" reactor had been in construction for the powerplant since 2008, and was going to double Stalburg's energy production compared to the older boiling water reactors. The construction was estimated to finish by 2012, but was delayed multiple times (likely due to the political corruption and embezzlement of maintenance funds).


===INFRA===
===INFRA===
Retrieved from "https://stalburg.net/Npp"