Tunnel2: Difference between revisions

Jump to navigation Jump to search
30 bytes added ,  21 June 2019
m
no edit summary
(Undo revision 4201 by Kumasasa (talk))
Tag: Undo
mNo edit summary
Line 13: Line 13:
}}
}}


{{stub}}
The Pine Fell Water Plant is a newer water pump station built upon an older piping station serving Stalburg. In stark contrast to other infrastructure, it's far cleaner and more modern than the tunnels and dam. This area is a way station for Mark between the now collapsed Bergmann Tunnels and the next set of tunnels. The player can continue through the area with minimal effort, or choose to repair the plant.  
The Pine Fell Water Plant is a newer water pump station built upon an older piping station serving Stalburg. In stark contrast to other infrastructure, it's far cleaner and more modern than the tunnels and dam. This area is a way station for Mark between the now collapsed Bergmann Tunnels and the next set of tunnels. The player can continue through the area with minimal effort, or choose to repair the plant.  


=Story=
=Story=
Before the events of INFRA, Marko, an employee at the plant, sent water samples to Pitheath Water Treatment Plant for contamination levels. The results showed the samples had detected metal contamination and high bacteria levels in the water pumping through the Pine Fell Water Plant, no doubt due to the opening of a new mine. One one of the engineers working at the plant got the results, and told Marko not to share the information, over fears of losing their jobs. Despite this disreputable behavior, the same employee tried to report the damage in the Bergmann tunnels to his boss, but was ignored.  
== Past events ==
Before the events of INFRA, Marko, an employee at the plant, sent water samples to Pitheath Water Treatment Plant for contamination levels. The results showed the samples had detected metal contamination and high bacteria levels in the water pumping through the Pine Fell Water Plant, no doubt due to the opening of a new mine.  


One one of the engineers working at the plant got the results, and told Marko not to share the information, over fears of losing their jobs. Despite this disreputable behavior, the same employee tried to report the damage in the Bergmann tunnels to his boss, but was ignored.
== During INFRA ==
After the collapse of the Bergmann Tunnels, Mark enters the plant to find it empty, he calls Paul again to inform him about the collapsed ceiling in the Bergmann tunnels. A reluctant Paul says Mark should find his way back underground through the water plant. Mark can cut the flow of water in the plant to take a pipe back into the tunnels, or alternatively chlorinate the water, resume the plant's operations, and take a basement route back underground to the next section of tunnels.  
After the collapse of the Bergmann Tunnels, Mark enters the plant to find it empty, he calls Paul again to inform him about the collapsed ceiling in the Bergmann tunnels. A reluctant Paul says Mark should find his way back underground through the water plant. Mark can cut the flow of water in the plant to take a pipe back into the tunnels, or alternatively chlorinate the water, resume the plant's operations, and take a basement route back underground to the next section of tunnels.  


Anonymous user

Navigation menu