Before the events of INFRA, Marko, an employee at the plant, sent water samples to Pitheath Water Treatment Plant for contamination levels. The results showed the samples had detected metal contamination and high bacteria levels in the water pumping through the Pine Fell Water Plant, no doubt due to the opening of a new mine.  
Before the events of INFRA, Marko, an employee at the plant, sent water samples to Pitheath Water Treatment Plant for contamination levels. The results showed the samples had detected metal contamination and high bacteria levels in the water pumping through the Pine Fell Water Plant, no doubt due to the opening of a new mine. One one of the engineers working at the plant got the results, and told Marko not to share the information, over fears of losing their jobs. Despite this disreputable behavior, the same employee tried to report the damage in the Bergmann tunnels to his boss, but these reports were ignored.
 
One one of the engineers working at the plant got the results, and told Marko not to share the information, over fears of losing their jobs. Despite this disreputable behavior, the same employee tried to report the damage in the Bergmann tunnels to his boss, but was ignored.  


== During INFRA ==
== During INFRA ==