Pine Fell Water Plant: Difference between revisions
Created page with "thumb|right|300px|Main pumping hall at the Pine Fell Water Plant facility The '''Pine Fell Water Plant'''<ref>''INFRA'' - Facility floor plan</ref><ref name="email1">''INFRA'' - ''"Pine Fell Water Plant!"'' e-mail</ref> facility, also known as the '''Hammer Valley Pumping Station'''<ref>''INFRA'' - Maxim's chatlog</ref>, is one of many<ref name="email1"/> pumping stations opera..." |
mNo edit summary |
||
| (5 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
[[File:Tunnel_2.jpg|thumb|right|300px|Main pumping hall at the Pine Fell Water Plant facility]] | [[File:Tunnel_2.jpg|thumb|right|300px|Main pumping hall at the Pine Fell Water Plant facility]] | ||
The '''Pine Fell Water Plant'''<ref>''[[INFRA]]'' - | The '''Pine Fell Water Plant'''<ref>''[[INFRA]]'' - facility floor plan</ref><ref name="email1">''INFRA'' - ''[[E-mails#Pine_Fell_Water_Plant!|"Pine Fell Water Plant!"]]'' e-mail</ref> facility, also known as the '''Hammer Valley Pumping Station''',<ref>''INFRA'' - [[:File:Tablet_screen_skin5.png|Maxim's chatlog]]</ref> is one of many<ref name="email1"/> pumping stations operated by [[Stalburg Water]] company in the Stalburg metropolitan area, that distribute potable water to nearby towns from the [[Stalburg]] city. | ||
==Overview== | ==Overview== | ||
''See also: [[ | ''See also: [[Tunnel1]] and [[Tunnel2]]'' | ||
The Pine Fell Water Plant facility is located at the ''Pine Fell'' hill<ref>The [[:File:Reserve_map.png|Reserve map]]</ref> within ''Hammer Valley'' area, it consists of two sections, an older underground one - built into the [[Bergmann_Water_Tunnels#Freshwater_Tunnel_No.1|Bergmann Water Tunnel]], used to control the water flow rate, and a newer one above the surface - hosting the pumping equipment. The facility is operated by at least three known personnel at rotating shifts, with at least one person present on-site at any time. | |||
==History== | ==History== | ||
| Line 13: | Line 12: | ||
On the morning of August 8th, 2016, the currently stationed<ref>As indicated by the today's morning newspaper in the facility</ref> employee noted issues with red pipes and ventured into the underground section to examine the issue.<ref>''INFRA'' - [[:File:Paper_a4_skin6.png|employee's note]]</ref> During his absence, [[Markku Siltanen]] enters the underground portion of the facility as part of routine inspection, and unintentionally triggers a massive collapse of the tunnel beneath the facility, before escaping to the surface portion using the elevator connecting the two. As a result of that, the staircase the station's employee used prior is collapsed, and the fate of that employee is unknown. | On the morning of August 8th, 2016, the currently stationed<ref>As indicated by the today's morning newspaper in the facility</ref> employee noted issues with red pipes and ventured into the underground section to examine the issue.<ref>''INFRA'' - [[:File:Paper_a4_skin6.png|employee's note]]</ref> During his absence, [[Markku Siltanen]] enters the underground portion of the facility as part of routine inspection, and unintentionally triggers a massive collapse of the tunnel beneath the facility, before escaping to the surface portion using the elevator connecting the two. As a result of that, the staircase the station's employee used prior is collapsed, and the fate of that employee is unknown. | ||
==See also== | |||
* [[Pitheath Water Treatment Plant]] | |||
* [[Stalburg Central Water Plant]] | |||
==References== | ==References== | ||
<references/> | <references/> | ||
{{Locations}} | |||