Stalburg Central Water Plant: Difference between revisions

Blubby (talk | contribs)
m Added a space between 'accessed.' and 'The'
Nextej (talk | contribs)
mNo edit summary
Line 1: Line 1:
The Stalburg Central Water Plant is an underground fresh water treatment facility that serves as the primary supplier of fresh water in [[Stalburg]]. The facility is fed by water supplied by the [[Bergmann Water Tunnels]], though it also has an auxiliary water feed used in the event of an insufficient supply from the tunnels. The facility also contains an illegally installed flushing line assembly which flushes raw sewage into various phases of treatment.
[[File:Water_Plant.jpg|thumb|right|300px|Main hall at the Stalburg Central Water Plant facility]]
The '''Stalburg Central Water Plant'''<ref>''[[INFRA]]'' - facility floor sign</ref><ref>''[[Stalburg Times]]'' - ''"Survey: People Worried About the Quality of Potable Water in Stalburg"''</ref><ref>''Stalburg Times'' - ''"The Prosecutor Demands Conditional Sentence for Causing the Water Crisis"''</ref> facility, also known as the '''Central Water Treatment Plant''',<ref>''INFRA'' - service tunnel direction sign</ref><ref>Unused content - map of all key infrastructure</ref> is an underground fresh water treatment facility located in central [[Stalburg]] and operated by [[Stalburg Water]] company, that serves as the primary supplier of potable water in Stalburg metropolitan area.
 
The facility is fed by water supplied by the [[Bergmann Water Tunnels]], though it also has an auxiliary water feed used in the event of an insufficient supply from the tunnels. The facility also contains an illegally installed flushing line assembly which allows to flush sewage, alongside the drainage of either the raw water pool or the main flocculation pool, into the ocean.


==Locations==
==Locations==
Line 26: Line 29:


The control center is located adjacent to the main flocculation pools, and contains the main controls for the water plant along with housing the various personnel related facilities. The first floor contains an employee sauna and locker room, a set of one-person restrooms, and the main controls for the facility's fire alarm system. The first floor is also the only floor from which the sedimentation and disinfection phases can be accessed. The plant's main control room is located on the second floor, and personnel offices can be found scattered throughout the second and third floors. A laboratory is located on the fourth floor, and the exit to the plant is located on the fifth, though these floors are never visited.
The control center is located adjacent to the main flocculation pools, and contains the main controls for the water plant along with housing the various personnel related facilities. The first floor contains an employee sauna and locker room, a set of one-person restrooms, and the main controls for the facility's fire alarm system. The first floor is also the only floor from which the sedimentation and disinfection phases can be accessed. The plant's main control room is located on the second floor, and personnel offices can be found scattered throughout the second and third floors. A laboratory is located on the fourth floor, and the exit to the plant is located on the fifth, though these floors are never visited.
==See also==
* [[Pine Fell Water Plant]]
* [[Pitheath Water Treatment Plant]]
==References==
<references/>


[[Category:Locations]]
[[Category:Locations]]