Main-Six: Difference between revisions

mNo edit summary
mNo edit summary
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{stub}}
{{Company_infobox
{{Company_infobox
   | title = Main-Six
   | title = Main-Six
Line 7: Line 5:
}}
}}


Main-Six is an electronics company. They manufacture water flow meters and control panels, and probably more.
'''Main-Six''' is a French company founded in 1986 that manufactures electronic components and chips. The company has a local branch in [[Stalburg]] and has manufactured SW-WFM6-EWL-M51 Water Flow Monitors for [[Stalburg Water]] used to monitor water systems and a Switch Control system for metro tracks.
 
==Products==
'''SW-WFM6-EWL-M51 Water Flow Monitors''' radiocommunicate with main control board at Pitheath Water Treatment plant, providing data about the water flow in the main fresh water canals, including Fisch River, Hammer Valley River, Bergmann Tunnel No. 1 and Bergmann Tunnel No. 2.
 
'''Switch Control''' allows the track switch to work in Auto mode, which allows it to be controlled remotely from a control center, or in Manual mode in which a physical operator can change between main and aux track from within the Switch Control panel.
 
==Trivia==
*Main-Six was created by [https://www.deviantart.com/jimmy-le-sniper Jimmy-le-sniper] and the design of its logo is loosely inspired by a one used by real Vinci Construction company.

Latest revision as of 18:57, 28 May 2024

Main-Six
mapimage:Main-Six
General
Company Main-Six
Status Active
Industry Electronics

Main-Six is a French company founded in 1986 that manufactures electronic components and chips. The company has a local branch in Stalburg and has manufactured SW-WFM6-EWL-M51 Water Flow Monitors for Stalburg Water used to monitor water systems and a Switch Control system for metro tracks.

ProductsEdit

SW-WFM6-EWL-M51 Water Flow Monitors radiocommunicate with main control board at Pitheath Water Treatment plant, providing data about the water flow in the main fresh water canals, including Fisch River, Hammer Valley River, Bergmann Tunnel No. 1 and Bergmann Tunnel No. 2.

Switch Control allows the track switch to work in Auto mode, which allows it to be controlled remotely from a control center, or in Manual mode in which a physical operator can change between main and aux track from within the Switch Control panel.

TriviaEdit

  • Main-Six was created by Jimmy-le-sniper and the design of its logo is loosely inspired by a one used by real Vinci Construction company.