Stalburg Water: Difference between revisions
mNo edit summary |
mNo edit summary |
||
| Line 17: | Line 17: | ||
Mark has to make his way through all 3 of these water plants. He can repair the Pine Fell, Pitheath and Central Water plants and restore them to full functionality, for which he earns the "Better than Before", "Purification" and "Reserve" achievements, respectively. However, to earn all achievements regarding the three water treatment plants, he must eat the kebab, check the water sample and bring the drink from the vending machine into the control room in the Pitheath Water Treatment Plant to earn the "Kebab speciale", "Not so Fresh Water" and "Anarchist" achievements respectively. | Mark has to make his way through all 3 of these water plants. He can repair the Pine Fell, Pitheath and Central Water plants and restore them to full functionality, for which he earns the "Better than Before", "Purification" and "Reserve" achievements, respectively. However, to earn all achievements regarding the three water treatment plants, he must eat the kebab, check the water sample and bring the drink from the vending machine into the control room in the Pitheath Water Treatment Plant to earn the "Kebab speciale", "Not so Fresh Water" and "Anarchist" achievements respectively. | ||
== | ==Employees== | ||
===Administration=== | |||
During 1983 | |||
*Pasi Haahka (General director) | |||
*Alex Houghton (Coffee, beer and leisure manager) | |||
*Ember Nieves (Accounting department manager) | |||
*Aaren Reid (Laboratorium manager) | |||
During 2016 | |||
*[[Roman Banis]] (CEO and director) | |||
As of 2017 | |||
*[[Elena Farkas]] (CEO and director) | |||
===Stalburg Central Water Plant=== | |||
*[[Tomas Balog]] | |||
*Vanesa Pop | |||
*[[Vivi Bondar]] | |||
===Pitheath Water Treatment Plant=== | |||
During 1981 to 1986 | |||
*Aku (maintainer) | |||
*Jorge (maintainer) | |||
During 2016 | |||
*[[Maxim]] (lab worker) | |||
*unnamed lab worker | |||
*A.S. (maintainer) | |||
*U.K. (maintainer) | |||
*[[Elena Farkas]] | |||
*Lara Willems | |||
===Pine Fell Water Plant=== | |||
*[[Marko]] | |||
*2 unnamed employees | |||
==Gallery== | ==Gallery== | ||
| Line 29: | Line 58: | ||
Water_Plant.jpg|The Stalburg Central Water Treatment Plant | Water_Plant.jpg|The Stalburg Central Water Treatment Plant | ||
</gallery> | </gallery> | ||
==Trivia== | |||
In the Pitheath Water Treatment Plant Laboratory, a kebab can be found. If Mark eats it, he starts hallucinating while weird sounds play in the background. The achievement "Remove Kebab" is awarded for eating the kebab. | |||
If Mark repairs all the Water Treatment Plants, at the end of the game, Stalburg Water CEO Roman Banis is replaced by Elena Farkas, and he is arrested for multiple financial offences. | |||