Tunnel2: Difference between revisions

From Stalburg Wiki
Jump to navigation Jump to search
mNo edit summary
No edit summary
 
(14 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Stub}}
{{Map_infobox
{{Map_infobox
   | image = Tunnel_2.jpg
   | image = Tunnel_2.jpg
Line 11: Line 9:
   | geocaches = 2
   | geocaches = 2
   | flowmeters = 0
   | flowmeters = 0
  | previousmap = [[tunnel1]]
  | nextmap = [[tunnel3]]
}}
}}
The Pine Fell Water Plant is a newer water pump station built upon an older piping station serving Stalburg. In stark contrast to other infrastructure, it's far cleaner and more modern than the tunnels and dam. This area is a way station for Mark between the now collapsed Bergmann Tunnels and the next set of tunnels. The player can continue through the area with minimal effort, or choose to repair the plant.
==Story==
===Past events===
Before the events of INFRA, Marko, an employee at the plant, sent water samples to Pitheath Water Treatment Plant for contamination levels. The results showed the samples had detected metal contamination and high bacteria levels in the water pumping through the Pine Fell Water Plant, no doubt due to the opening of a new mine. One one of the engineers working at the plant got the results, and told Marko not to share the information, over fears of losing their jobs. Despite this disreputable behavior, the same employee tried to report the damage in the Bergmann tunnels to his boss, but these reports were ignored.
===INFRA===
After the collapse of the Bergmann Tunnels, Mark enters the plant to find it empty, he calls Paul again to inform him about the collapsed ceiling in the Bergmann tunnels. A reluctant Paul says Mark should find his way back underground through the water plant. Mark can cut the flow of water in the plant to take a pipe back into the tunnels, or alternatively chlorinate the water, resume the plant's operations, and take a basement route back underground to the next section of tunnels.
==Locations==
===The Plant===
The Pine Fell Water Plant is responsible for pumping water from the tunnels below, pre-treating the water for further purification processes, transportation, and observation of the water contaminant levels. Except for a few failures in the concrete and pipes, the plant is in unusually good shape. This can be attributed to its novelty, being recently built upon a far older pumping station below it. Despite this, the water is heavily contaminated, and in need of urgent chlorination.
===Mushroom Cave===
Along the side of the Pine Fell Water Plant is a small cave dug into the side of a hill. It is well covered by trees and bushes, but still accessible. It contains a patch of green mushrooms, a geocache, and a note written by an unknown individual. The note makes the first reference to "[[The Machine]]," and presumably offers a succinct account of its creation and purpose.
==Achievements==
{| class="wikitable sortable" style="width: 70%;"
!style="width: 5%"| Icon !!style ="width: 20%""| Name !!style="width: 75%" | Description
|-
|[[File:Ach_betterthanbefore.jpg]]||Better than Before||Fix the problems at the Pine Fell Water Plant and get back underground without disrupting the operation.
|}
===Mistake Targets===
*In the building's office, don't trigger the fire alarm.
*Disrupting the water flow to access the alternate pipe path counts as a mistake.
*Failure to activate the water chlorination while fixing the plant's operations counts as a mistake.
==Gallery==
====Documents====
<gallery>
File:Paper a4 skin6.png|Note to Pinefell Water Plant employee about keeping pump A1 and A2 off.
File:Newspaper 001 skin1.png|Stalburg Times newspaper dated August 8th, 2016.
File:Paper a4 001 skin6.png|Note to Marko about hiding the results of the contaminated water samples.
File:Paper a4 001 skin7.png|Note to Marko about the state of the tunnels and Open Sewer.
File:Paper a4 001 skin11.png|Note from Erik when he started working with Robin.
File:Paper a4 skin9.png|A mysterious corroded note, cleaned up version can be found [[The Machine|here]].
</gallery>
====Collectibles====
<gallery>
File:Pine_fell_first_floor.png
File:Pine_fell_second_floor.png
File:Pine_fell_basement.png
File:Pine_fell_exit_shaft.png
</gallery>


{{Bot_integration}}
{{Bot_integration}}

Latest revision as of 22:03, 27 March 2022

tunnel2
mapimage:tunnel2
General
Map Name tunnel2
BSP Name infra_c3_m2_tunnel2
Stalburg Map tunnel2
Statistics
Photo Spots 9
Corruption Spots 6
Repair Spots 1
Mistake Spots 3
Geocaches 2
Water Flow Meters 0
Connected Maps
Previous Map tunnel1
Next Map tunnel3


The Pine Fell Water Plant is a newer water pump station built upon an older piping station serving Stalburg. In stark contrast to other infrastructure, it's far cleaner and more modern than the tunnels and dam. This area is a way station for Mark between the now collapsed Bergmann Tunnels and the next set of tunnels. The player can continue through the area with minimal effort, or choose to repair the plant.

Story[edit | edit source]

Past events[edit | edit source]

Before the events of INFRA, Marko, an employee at the plant, sent water samples to Pitheath Water Treatment Plant for contamination levels. The results showed the samples had detected metal contamination and high bacteria levels in the water pumping through the Pine Fell Water Plant, no doubt due to the opening of a new mine. One one of the engineers working at the plant got the results, and told Marko not to share the information, over fears of losing their jobs. Despite this disreputable behavior, the same employee tried to report the damage in the Bergmann tunnels to his boss, but these reports were ignored.

INFRA[edit | edit source]

After the collapse of the Bergmann Tunnels, Mark enters the plant to find it empty, he calls Paul again to inform him about the collapsed ceiling in the Bergmann tunnels. A reluctant Paul says Mark should find his way back underground through the water plant. Mark can cut the flow of water in the plant to take a pipe back into the tunnels, or alternatively chlorinate the water, resume the plant's operations, and take a basement route back underground to the next section of tunnels.

Locations[edit | edit source]

The Plant[edit | edit source]

The Pine Fell Water Plant is responsible for pumping water from the tunnels below, pre-treating the water for further purification processes, transportation, and observation of the water contaminant levels. Except for a few failures in the concrete and pipes, the plant is in unusually good shape. This can be attributed to its novelty, being recently built upon a far older pumping station below it. Despite this, the water is heavily contaminated, and in need of urgent chlorination.

Mushroom Cave[edit | edit source]

Along the side of the Pine Fell Water Plant is a small cave dug into the side of a hill. It is well covered by trees and bushes, but still accessible. It contains a patch of green mushrooms, a geocache, and a note written by an unknown individual. The note makes the first reference to "The Machine," and presumably offers a succinct account of its creation and purpose.

Achievements[edit | edit source]

Icon Name Description
Ach betterthanbefore.jpg Better than Before Fix the problems at the Pine Fell Water Plant and get back underground without disrupting the operation.

Mistake Targets[edit | edit source]

  • In the building's office, don't trigger the fire alarm.
  • Disrupting the water flow to access the alternate pipe path counts as a mistake.
  • Failure to activate the water chlorination while fixing the plant's operations counts as a mistake.

Gallery[edit | edit source]

Documents[edit | edit source]

Collectibles[edit | edit source]