Cistern: Difference between revisions

info regarding nov 11th update
Nextej (talk | contribs)
mNo edit summary
 
(3 intermediate revisions by the same user not shown)
Line 17: Line 17:
==Story==
==Story==
===Past events===
===Past events===
Prior to the events of ''INFRA'', the Bergmann Group was constructing a cistern. The Stalburg Bank began to lobby against the project despite how close to it was to completion, arguing that it posed a security risk to the bank. On the verge of bankruptcy, the Bergmann Group had to abandon the project, leaving their worklights, vehicles and other equipment behind. Following the cancellation of the project and total bankruptcy of the Bergmann group, one worker was driven to alcoholism and committed suicide in the unfinished cistern, the body is nowhere to be seen.  
Prior to the events of ''INFRA'', the Bergmann Group was constructing a cistern. The Stalburg Bank began to lobby against the project despite how close to it was to completion, arguing that it posed a security risk to the bank. On the verge of bankruptcy, the Bergmann Group had to abandon the project, leaving their work lights, vehicles and other equipment behind. Following the cancellation of the project and total bankruptcy of the Bergmann group, one worker was driven to alcoholism and committed suicide in the unfinished cistern, the body is nowhere to be seen.  


===INFRA===
===INFRA===
Line 24: Line 24:
==Locations==
==Locations==
===Cistern===
===Cistern===
A halted construction project by the Bergmann group. Excess water from the stormdrain would of led through outflow gates be stored here. Most of the equipment was left behind by the workers, and the scaffolding is still up. The cistern itself showed signs of faulty construction, concrete damage being present in several places, as well as asbestos being used in the construction.  
A halted construction project by the Bergmann group. Excess water from the stormdrain would have led through outflow gates to be stored here. Most of the equipment was left behind by the workers, and the scaffolding is still up. The cistern itself showed signs of faulty construction, concrete damage being present in several places, as well as asbestos being used in the construction.


=== Blocked Maintenance Tunnel ===
=== Blocked Maintenance Tunnel ===
Line 37: Line 37:
====Locations====
====Locations====
<gallery>
<gallery>
File:PreCisternHall.jpg|The tunnel before the update.
File:CisternHall.jpg|The changed tunnel after the November 11th update.  
File:CisternHall.jpg|The changed tunnel after the November 11th update.  
File:CisternMorkoMask.jpg| Unique mask model behind the crack in the barricade.  
File:CisternMorkoMask.jpg| Unique mask model behind the crack in the barricade.  
</gallery>
</gallery>


<br />{{Bot_integration}}
{{Modules}}
{{Bot_integration}}